Projects small renovation company – Konstruktion https://konstruktion.vamtam.com Mon, 14 Nov 2022 14:25:27 +0000 en-US hourly 1 https://wordpress.org/?v=6.1.1 https://konstruktion.vamtam.com/wp-content/uploads/2022/09/cropped-favicon-32x32.png Projects small renovation company – Konstruktion https://konstruktion.vamtam.com 32 32 Kitchen Renovation https://konstruktion.vamtam.com/2022/10/21/kitchen-renovation/ Fri, 21 Oct 2022 13:50:57 +0000 https://konstruktion.vamtam.com/?p=4560
Client

Cadillac Fairview Corporation Limited

Sector

Buildings

Location

New York, NY

Kitchen Renovation

A premiere address in Toronto’s Financial District, 160 Front Street West is a 46-story structural steel-framed commercial office tower designed to add a distinctive silhouette to the City’s skyline. Although complex, PCL’s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls and integrates the heritage masonry of the 70-year-old, six-story building previously located on the site. 

160 Front Street West is designed to add a distinctive silhouette to the City’s skyline.

Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.

160 Front Street West includes over 12,000 square feet of retail space and 339 parking stalls.

Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.

]]>
Astor Place Boutique Condo https://konstruktion.vamtam.com/2022/10/21/astor-place-boutique-condo/ Fri, 21 Oct 2022 13:49:42 +0000 https://konstruktion.vamtam.com/?p=4559
Client

Cadillac Fairview Corporation Limited

Sector

Buildings

Location

New York, NY

Astor Place Boutique Condo

A premiere address in Toronto’s Financial District, 160 Front Street West is a 46-story structural steel-framed commercial office tower designed to add a distinctive silhouette to the City’s skyline. Although complex, PCL’s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls and integrates the heritage masonry of the 70-year-old, six-story building previously located on the site. 

160 Front Street West is designed to add a distinctive silhouette to the City’s skyline.

Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.

160 Front Street West includes over 12,000 square feet of retail space and 339 parking stalls.

Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.

]]>
Floor and Railing Repairs https://konstruktion.vamtam.com/2022/10/21/floor-and-railing-repairs/ Fri, 21 Oct 2022 13:48:52 +0000 https://konstruktion.vamtam.com/?p=4558
Client

Cadillac Fairview Corporation Limited

Sector

Buildings

Location

New York, NY

Floor and Railing Repairs

A premiere address in Toronto’s Financial District, 160 Front Street West is a 46-story structural steel-framed commercial office tower designed to add a distinctive silhouette to the City’s skyline. Although complex, PCL’s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls and integrates the heritage masonry of the 70-year-old, six-story building previously located on the site. 

160 Front Street West is designed to add a distinctive silhouette to the City’s skyline.

Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.

160 Front Street West includes over 12,000 square feet of retail space and 339 parking stalls.

Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.

]]>
Small Bathroom Tiling https://konstruktion.vamtam.com/2022/10/21/small-bathroom-tiling/ Fri, 21 Oct 2022 13:47:13 +0000 https://konstruktion.vamtam.com/?p=4557
Client

Cadillac Fairview Corporation Limited

Sector

Buildings

Location

New York, NY

Small Bathroom Tiling

A premiere address in Toronto’s Financial District, 160 Front Street West is a 46-story structural steel-framed commercial office tower designed to add a distinctive silhouette to the City’s skyline. Although complex, PCL’s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls and integrates the heritage masonry of the 70-year-old, six-story building previously located on the site. 

160 Front Street West is designed to add a distinctive silhouette to the City’s skyline.

Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.

160 Front Street West includes over 12,000 square feet of retail space and 339 parking stalls.

Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.

]]>
Roof Restoration Coventry https://konstruktion.vamtam.com/2022/10/21/roof-restoration-coventry/ Fri, 21 Oct 2022 13:44:48 +0000 https://konstruktion.vamtam.com/?p=4550
Client

Cadillac Fairview Corporation Limited

Sector

Buildings

Location

New York, NY

Roof Restoration Coventry

A premiere address in Toronto’s Financial District, 160 Front Street West is a 46-story structural steel-framed commercial office tower designed to add a distinctive silhouette to the City’s skyline. Although complex, PCL’s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls and integrates the heritage masonry of the 70-year-old, six-story building previously located on the site. 

160 Front Street West is designed to add a distinctive silhouette to the City’s skyline.

Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.

160 Front Street West includes over 12,000 square feet of retail space and 339 parking stalls.

Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.

]]>
John Mayer Kitchen Renovation https://konstruktion.vamtam.com/2022/10/21/john-mayer-kitchen-renovation/ Fri, 21 Oct 2022 13:37:25 +0000 https://konstruktion.vamtam.com/?p=4549
Client

Cadillac Fairview Corporation Limited

Sector

Buildings

Location

New York, NY

John Mayer Kitchen Renovation

A premiere address in Toronto’s Financial District, 160 Front Street West is a 46-story structural steel-framed commercial office tower designed to add a distinctive silhouette to the City’s skyline. Although complex, PCL’s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls and integrates the heritage masonry of the 70-year-old, six-story building previously located on the site. 

160 Front Street West is designed to add a distinctive silhouette to the City’s skyline.

Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.

160 Front Street West includes over 12,000 square feet of retail space and 339 parking stalls.

Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.

]]>